

This bathroom was completely gutted. The serious problematic leak behind the bath was diagnosed and solved. A dehumidifier was placed in the room to dry it out for two days before work could commence.
The layout was kept the same in this instance, the skirting was removed to allow for a much cleaner join between wall tiles and flooring. Travertine tiles were used to produce a fresh and rejuvenated bathroom.
Notice how the ‘R2D2’ dustbin has a new position in the finished room!
Contrasting caramel/cappuccino travertine tiles complemented a softly curved china-white bathroom suite.